Welcome to Casa Mimosa - our first completed renovation. This is a photographic diary of the building process month by month.
![]() |
This is the original part of the farm house which will be restored. |
![]() |
Back section of the house, mostly farm sheds - to be demolished. |
![]() |
The other side of the back - again farm sheds. |
![]() |
A trap door into the roof - home to a family of barn owls. |
![]() |
Old storeroom with antique floor. |
![]() |
Garage and wood store. |
![]() |
Single storey part of the orginal house where British soldiers were hidden during the War. |
![]() |
The barn where the local farmer stored his straw. |
June 2006 » Work Starts
![]() |
On the site where the barn was, the foundations were dug for the 13.5m x 6m pool. |
![]() |
The view the pool will have. |
July
![]() |
The pool cemented but not lined. |
![]() |
Construction of veranda, removal of fig tree. |
Mid-July
![]() |
Filling up the pool. Too excited to wait!! |
![]() |
Getting there... |
![]() |
Night shot of pool in action. |
![]() |
View of house from new terrace. |
![]() |
Terrace towards the pool. |
![]() |
Terrace with view towards the mountains. |
October
![]() |
View from nearby hill - pool covered for the winter. |
January '07 (Work has begun on house)
![]() |
Taking off all the beautiful old roof tiles and palleting them for safe keeping. |
February
![]() |
The back of the house: Completely demolished. |
![]() |
Roof tiles are now off the hideaway. |
![]() |
Making another archway for what will be the kitchen. |
![]() |
Front of Mimosa covered in scaffolding. |
![]() |
All the foundations ready. Neatly palleted stone, tiles, bricks etc in the background. |
Mid-February
![]() |
Surprise! No foundations under the remaining house! |
![]() |
No problem: concrete blocks put in - and it's lunch time! |
March
![]() |
New arch constructed in the kitchen to match original. Will be replicated twice more on the ground floor. |
![]() |
All foundations are complete and the supporting pillars are ready to be filled with cement. |
![]() |
Windows enlarged and created in the south facing wall. Part of the 45ft long kitchen. |
April
![]() |
All ground floor supporting pillars in place. Starting the frame work for the vaulted ceilings. |
![]() |
When dried, wood & polystyrene are removed from below leaving a fantastic vaulted ceiling. |
![]() |
Old bedroom upstairs in the original house ready to be cemented over and tiled. |
![]() |
View of what will be the sitting room, hall and music room. |
End of April
![]() |
Recreated vaulted ceilings in the whole of the downstairs. |
![]() |
Preparing for the main architraves. |
May
![]() |
Stone work has started on the inside. Arches are being recreated. |
![]() |
Facing the new part in the old stone. |
![]() |
Mimosa taking shape! |
June
![]() |
Removing the polystyrene mould for the arch into the 'snug'. |
![]() |
Sandblasting all the stone work: a long, meticulous and laborious job. |
![]() |
The roof from the inside. Wooden beams and terracotta tiles. |
![]() |
Our stone man, one of very few artisans left who know how to work with Maiella stone. |
![]() |
Mimosa viewed from the lane. |
July 2007 - Mimosa Completed
![]() |
Mimosa finally finished after only 6 months. |
![]() |
From the olive grove towards the house. |
![]() |
From the terrace towards the pool house and table tennis area. |
![]() |
The fantastic 45 foot long kitchen with all mod cons. |
![]() |
The "snug" leading into the hall. Wood burner for a cosy winter! |
![]() |
The wonderful spacious hall with a piano, leading to the snug and kitchen. |
![]() |
The Red double bedroom and shower room ensuite. |
![]() |
The Orange double bedroom and shower room ensuite. |
![]() |
The Green twin bedroom and shower room ensuite. |
![]() |
The Yellow twin bedroom with shower room ensuite. |
![]() |
The Blue twin bed room with bunks and an ensuite bathroom |
![]() |
Now the work is done, time to sit by the pool and watch the sun set. |
Click here to check availability for Casa Mimosa.
View the Casa Mimosa flyer.
Land: +44 (0)1264 810 171
Mob: +44 (0)7740 443 460
It. Mob: 00393494567806
Email:
office@houses-in-italy.co.uk
01/01/07
Houses in Italy launches houses-in-italy.co.uk.
more..
13/08/06
"In Abruzzi, Italy shows a rougher edge" - Article in the N.Y.Times. more..
01/08/06
Wikipedia general info on Abruzzo. view..
Come and see us for a glass of wine at La Dolce Vita Exhibition. Contact us for complimentary tickets (1st come, 1st served!)