Property Renovation in Abruzzo: Casa Mimosa Photo Diary - Houses in Italy Contact Houses in Italy

Photo Diary: Casa Mimosa, Property under Renovation in Abruzzo

Welcome to Casa Mimosa - our first completed renovation. This is a photographic diary of the building process month by month.

Casa Mimosa: Property under Renovation in Abruzzo
Casa Mimosa: Property under Renovation, Abruzzo

This is the original part of the farm house which will be restored.

Casa Mimosa: Back of Property

Back section of the house, mostly farm sheds - to be demolished.

Casa Mimosa: Back of Property 2

The other side of the back - again farm sheds.

Casa Mimosa: Trap Door into Roof

A trap door into the roof - home to a family of barn owls.

Abruzzo Renovation Property: Old Storeroom

Old storeroom with antique floor.

Abruzzo Renovation Property: Garage & Woodstore

Garage and wood store.

Abruzzo Renovation Property: Single Storey

Single storey part of the orginal house where British soldiers were hidden during the War.

Abruzzo Renovation Property: Barn

The barn where the local farmer stored his straw.

June 2006 » Work Starts

Abruzzo Property Renovation: Pool Foundations

On the site where the barn was, the foundations were dug for the 13.5m x 6m pool.

Abruzzo Property Renovation: Pool View

The view the pool will have.

July

Abruzzo Property Renovation: Pool Cemented

The pool cemented but not lined.

Abruzzo Property Renovation: Veranda Construction

Construction of veranda, removal of fig tree.

Mid-July

Abruzzo Property Renovation: Filling the Pool

Filling up the pool. Too excited to wait!!

Abruzzo Property Renovation: Getting There

Getting there...

Pool at Night, Abruzzo Property Renovation

Night shot of pool in action.

New Terrace View, Abruzzo Property Renovation

View of house from new terrace.

Terrace to Pool, Abruzzo Property Renovation

Terrace towards the pool.

Mountain View, Abruzzo Property Renovation

Terrace with view towards the mountains.

October

House from Hill: Abruzzo Property Renovation

View from nearby hill - pool covered for the winter.

January '07 (Work has begun on house)

Casa Mimosa: Removing Roof Tiles

Taking off all the beautiful old roof tiles and palleting them for safe keeping.

February

Mimosa: back of the house demolished

The back of the house: Completely demolished.

Roof tiles are now off the hideaway

Roof tiles are now off the hideaway.

Mimosa: kitchen archway

Making another archway for what will be the kitchen.

Mimosa: Front under scaffolding

Front of Mimosa covered in scaffolding.

Casa Mimosa: foundations ready

All the foundations ready. Neatly palleted stone, tiles, bricks etc in the background.

Mid-February

Property Renovation: no foundations

Surprise! No foundations under the remaining house!

Property Renovation: lunch time

No problem: concrete blocks put in - and it's lunch time!

March

Casa Mimosa: new arch

New arch constructed in the kitchen to match original. Will be replicated twice more on the ground floor.

Foundations Complete

All foundations are complete and the supporting pillars are ready to be filled with cement.

New Windows

Windows enlarged and created in the south facing wall. Part of the 45ft long kitchen.

April

Vaulted Cieling Frame Work

All ground floor supporting pillars in place. Starting the frame work for the vaulted ceilings.

Foundations Complete

When dried, wood & polystyrene are removed from below leaving a fantastic vaulted ceiling.

Old bedroom

Old bedroom upstairs in the original house ready to be cemented over and tiled.

Sitting room, hall and music room

View of what will be the sitting room, hall and music room.

End of April

Vaulted ceilings

Recreated vaulted ceilings in the whole of the downstairs.

Main archetraives

Preparing for the main architraves.

May

Stone work & arches

Stone work has started on the inside. Arches are being recreated.

Old stone

Facing the new part in the old stone.

Mimosa taking shape!

Mimosa taking shape!

June

Removing Polystyrene

Removing the polystyrene mould for the arch into the 'snug'.

sandblasting

Sandblasting all the stone work: a long, meticulous and laborious job.

Inside roof

The roof from the inside. Wooden beams and terracotta tiles.

Our stone man

Our stone man, one of very few artisans left who know how to work with Maiella stone.

Mimosa!

Mimosa viewed from the lane.

July 2007 - Mimosa Completed

Mimosa finished

Mimosa finally finished after only 6 months.

Olive grove to house

From the olive grove towards the house.

Terrace to poolhouse

From the terrace towards the pool house and table tennis area.

Kitchen

The fantastic 45 foot long kitchen with all mod cons.

The snug

The "snug" leading into the hall. Wood burner for a cosy winter!

Hall with piano

The wonderful spacious hall with a piano, leading to the snug and kitchen.

Red

The Red double bedroom and shower room ensuite.

Orange

The Orange double bedroom and shower room ensuite.

Green

The Green twin bedroom and shower room ensuite.

Yellow

The Yellow twin bedroom with shower room ensuite.

Blue

The Blue twin bed room with bunks and an ensuite bathroom

Sunset

Now the work is done, time to sit by the pool and watch the sun set.